The phase two fastening and frame replacement crew during summer
2002.
|

Project Manager Sequoia Sun.
|

Consulting Marine Engineer Captain Brian Newton and the crew
inspect the bottom of the keel.
|

Albert Sanchez has worked on Dolphin for more than five years
under two previous owners.
|

Carpenter Steve Miller
|
Boatwright
Mark Hackshaw installs new keel butterflys.
|

Ty Shemin replacing fastenings on port side planks.
|

Flaco Villena (left) and assistant, part of the welding crew,
shown here fabricating one of the new frames.
|

Mechanical Engineer (as well as life-long friend and former
boat partner) Wilson Allen makes notes to draw up the Frame Plan
and Replacement Schedule.
|
| |
|
|
| |
|
|